There has been a lot of small things going on since the last update. The exterior of the house now has all the vinyl, the balcony has the Trex flooring laid, the rock columns in the front are up and the decorative support pieces are in place on the dormers. See the pictures below:
But more importantly the cabinets are being installed this week. There will be cabinets going in the kitchen, bathrooms and the craft room. I was tempted to post photos of the cabinets without the granite tops in place, but decided to wait until the granite is installed. Instead I want to give a big thank you to Mark Shelton of Shelton Kitchens and Bath for getting the cabinets installed so quickly. Nearly all the cabinets were in place the first day, and the second day all the handles were installed. That seemed very fast (and accurate, all the cabinets were level horizontally and vertically). Here is Shelton's contact information in case you need cabinet work: